Prepare all the process related calculation and reports, including but not limited to process report, process calculation note, mass balance, utility consumption table
Check piping and instrumentation diagram for process, control and equipment part
Prepare control philosophy
Prepare hydraulic gradient line and specific hydraulic study
Prepare all the equipment related calculation, including but not limited to TMH for pumps, discharge pressure of blowers, service water consumption, compressed air system
Prepare equipment/instrument specification, as well as equipment list
Check supplier's offers for conformity with the inquiry, technical optimization of offers, and comparative analysis of supplier's technical offers
Requirement
Bachelor’s or master’s degree holder
More than 5 years of working experience in water treatment or engineering industry
Experience in design institutes or related
Familiar with design of water treatment process
Familiar with equipment characteristics, material, and limitations